The most frequently asked question.

At Ritual Interiors, we believe our time is just as valuable as yours. Some partnerships aren’t a good match, budget differences, time allotment, and design preferences are all legitimate reasons to to not move forward.

If you are hoping to have a project done with ritual interiors, this may be a good place to start.

Pricing on a remodeling can very widely depending on a few factors, such as

Quality of craftsmanship: While it may not take much money or time to remodel a full bathroom with the most basic flooring, water proofing, and features, the old saying rings true. you get what you pay for.

For a full bathroom remodel, including full demolition to the wall studs, floor joists, and ceiling, re working of all plumbing, electrical, and finish carpentry, you can safely assume to spend 15,000-30,000

This guide is meant to help you, the homeowner, base your project around your budget. These are all examples of how much a typical job costs in each price range. These prices include everything from the dump runs to the screws needed.

The examples included are based on a shower sized 3x4. A larger shower will cost more to install.

 The only material we suggest the homeowner buys is the finish material such as tile and paint. However, if you would prefer us to buy and pick it up, that is fine. It just adds an extra step to the potential return process, and an extra charge for pick up/delivery.

 At the end of the document there will be general pricing for our custom work/add ons

 

What to expect: Tier 1

At this price point, you can expect minor demolition and project completion in typically 7-10 days. This is meant as a touch up to your area. Leaving your area looking generally the same.

This is a route we will often suggest when a homeowner has found water damage due to failing tile.

$7000

Example

New 3x4 standing shower, glass doors, new fixtures, new accessories.

-----or-----

New floor tile new vanity/mirror new accessories

-----or-----

New 3x4 standing shower, 1 niche, glass doors.

-----or-----

New floor tile, new wall paint, new accessories

Tier 2

At this price you can expect a reasonable amount of demolition and project completion in 20-30 days. This is meant to change your area completely. We can change aspects of the room (remove non load bearing walls, add walls, change plumbing/ electrical locations etc.) leaving you with a new space to enjoy for years to come.

$19,000

 

Example

New 3x4 standing shower, glass doors, new floor tile, new wall paint, new fixtures.

-----or-----

New 3x4 standing shower, glass doors, 2 niches, tile inlay, accent wall, new wall paint.

-----or-----

New 3x4 standing shower, marble floor, one niche, new bathroom floor tile.

-----or-----

New floor tile with heated flooring, new wall paint, new vanity, new accessories.

Tier 3

At this price point, we pull out all the stops. We will start with a design meeting, where we will discuss your vision for your area. After we have a good idea of what you want, we will make a rendering of the space, giving you the chance to make any changes after seeing your area.

At this price you can expect complete demolition, right down to the wall studs and floor/ceiling joists. Project completion in 30-45 days (including design segment). This is meant to be a masterpiece in your home, filled with custom work, high end accessories, and anything else you can think of. We can change aspects of the room (remove non load bearing walls, add walls, change plumbing/ electrical locations etc.)

$42,000

Example

New 3x4 standing shower, glass doors, 2 niches, marble inlay, new floor tile, heated flooring, new wall paint, new accessories, new vanity.

-----or-----

New jacuzzi tub, glass doors, new floor tile, heated flooring, new wall paint, accent tile wall, new accessories

-----or-----

New 3x4 steam shower, tile wall inlay, glass doors, custom tile bench, new floor tile, heated flooring, new wall paint

All “add on” prices are an estimated cost of installation. This does not include purchasing or shipping of material.

Heated floor $1500

Wet Niche $500

Dry Niche $250

Shower bench (tiled) $750.

Tile Inlay

1’x3’ $250

2’x3’ $400

4’x4’ $550

Pie shelves $75 per install

Dump run $100 per trip.

Design services $2500